Novelties

  • New company foundation
  • Cultivation beds
  • Current construction site report

New company foundation

Due to the closure of TM Bohrtechnik we were looking for a solution to continue to serve our customers with their replacement lines and products. With a part of the existing employees we were allowed to found the new company Lumesa GmbH in Austria after a long and good cooperation. 
It is with great pleasure that we can inform you that we can now advise and serve you as usual through Lumesa in Lumino, as well as now with the newly founded Lumesa GmbH in AUSTRIA, at the usual location of the former TM Bohrtechnik GmbH. With the takeover of a part of the expert staff of TM Borhtechnik GmbH you will benefit from even more know how and service around the extension of our offers.


20211207_131356.jpg

TML92 and TML92P attachable cradles

In these almost 2 years of existence, we are proud to say that in the field the product meets the customer requirements. We have 2 types of attachable cradles, which are also available for rent:

  • TML92 / Eurodrill RD1002: 1400 kg - for self-drilling anchors / blast hole rock drilling.
  • TML92P / Eurodrill RH4x: 1900 kg - for self-drilling anchors / blast hole rock drilling / cased hole drilling

Construction site report

Key data:

  • Customer: Hastag St. Gallen
  • Construction site: Sitter viaduct SBB, St. Gallen
  • Project: widening of pedestrian & bicycle path to 4 meters
  • Tendons: with 800 kN load

Lumesa products in use:

  • Drill mount: Mounty 90
  • Rotary head: NL3 with down-the-hole hammer 3''
  • Powerpack: KSD93F - radio controlled

The data of our new control unit:

  • Hydraulics: Adjustable axial piston pump (LS) - 100 l/min 200 bar
  • Weight: 700 kg
  • Frame: in stainless steel
  • Radio remote control Autec (over 100 m range)

For this site we have upgraded and tested our new power unit KSD93F with Yanmar stage V engine and sound insulation. We innovatively fulfilled the requirement that the engine can be remote controlled. The operation was a success. The work was carried out professionally and on time. 

The report